Viessmann Allendorf Technical Centre
Viessmann Allendorf Technical Centre
Viessmann Allendorf Technical Centre
Viessmann Allendorf Technical Centre
Viessmann Allendorf Technical Centre
Viessmann Allendorf Technical Centre
Viessmann Allendorf Technical Centre
Viessmann Allendorf Technical Centre
Info

A building for the development and testing of heat generation systems was to be built into the existing hall structure on the existing factory premises. After the demolition of the existing hall, functions such as test stands, prototype workshop, laboratories, production and development areas with offices will be accommodated in two construction phases. The test stand hall is installed high up and forms the heart of the technical centre.

Client
Viessmann Allendorf
GFA
13.800 m² 1.BA, 1.100 m² 2. BA
Period of service
2012 till 2016 1. BA, 2017 till 2020 2. BA
Services
Building planning