A four-storey assembly and logistics building was erected in the middle of the existing factory site of Porsche AG in Stuttgart - Zuffenhausen. After the existing building Plant 2 was dismantled, the 40 m high building was built from a point 20 m into the ground, notably in the area of the integrated two-storey automated warehouse. With a width of 130 m the building also contains office, technical and social areas.